Get instant live expert help on I need help with percentage bar diagram

“My Excelchat expert helped me in less than 20 minutes, saving me what would have been 5 hours of work!”

Post your problem and you’ll get expert help in seconds.

Our professional experts are available now. Your privacy is guaranteed.

Here are some problems that our users have asked and received explanations on

Hi! I'm making a diagram for my thesis. I would like to have a different standard deviation per bar, but I don't know how to do that. I figured out how to change standard deviation for all bars, but not how to change each bar separately.
Solved by F. H. in 20 mins
Hi, I need to create a horizontal bar chart with two categories. The first is a percentage (where the bar will extend to) and then there is a category to color code each bar. Not sure how to do the latter.
Solved by O. Y. in 28 mins
I need a conditional format to fill data bar in the same cell when I change completion percentage with type of completion and percentage number (i.e. running 50% to running 60% and walking 50% Walking 75% etc.).
Solved by T. A. in 12 mins
When I make modifications to a diagram prepared on Excel the modifications "save" OK in Excel but don't show up when I copy and paste the diagram to my Word document
Solved by C. F. in 20 mins
I need a formula for conditional formatting a cell based on a percentage of another cell, This is for a project Timeline Manager chart so would like the formula to auto copy when adding new projects. C1 = blank H3 = percentage data bar 0-100% I would like: C1 to input "Not Started" if Percentage of H3 is 0% C1 to input "In Progress" if percentage of H3 is between 1-99% C1 to input "complete" if percentage of H3 is 100%
Solved by I. J. in 21 mins