I need two things. 1. I need a line graph to chart the results based on each test (TSH, T3, T4) according to the date. So date on the y axis and value range on the x axis. Tests on one chart.
Then. I need a chart for test TSH with the dates on y and value on x, and a line to show that... but I also need a MIN line and a MAX line. I need this for all three tests.
So i need 4 seperate line charts.
Solved by D. S. in 16 mins